| REPORT ON UTILITIES, OSAKA-KOBE-KYOTO AREA JAPAN |
|
| REPORT ON UTILITIES, OSAKA-KOBE-KYOTO AREA JAPAN |
|
| REPORT ON UTILITIES, OSAKA-KOBE-KYOTO AREA JAPAN |
|
| ENGINEER REPORT - OCCUPATION OF JAPAN |
|
| [REPORT] CONSTRUCTION OF AIRFIELDS IN NORTH BURMA UNDER THE ARMY AIR FORCES |
|
| [REPORT] ENGINEER CONSTRUCTION IN THE SOUTHWEST PACIFIC AREA |
|
| [MAP] EASTERN NEW GUINEA NAVIGATION CHART |
|
| [REPORT] SALWEEN RIVER BRIDGE BURMA ROAD |
|
| [REPORT] SALWEEN RIVER BRIDGE BURMA ROAD |
|
| [REPORT] MEKONG RIVER BRIDGE BURMA ROAD |
|
| [REPORT] MEKONG RIVER BRIDGE BURMA ROAD |
|
| [APPENDIX E, MAP OF THE ASSAM-BURMA-CHINA PIPELINE] |
|
| [APPENDIX A I, MAP OF ROAD ROUTE, LEDO M.P.O. TO WANTING M.P. 483][WITH ATTACHMENTS] |
|
| HISTORICAL MONOGRAPH REGARDING RECONSTRUCTION IN GREECE |
|
| HISTORICAL MONOGRAPH REGARDING RECONSTRUCTION IN GREECE |
|
| CORINTH CANAL COMPLETION REPORT |
|
| COMPLETION REPORT, HIGHWAY PROGRAM GREECE |
|
| [REPORT OF CORPS OF ENGINEERS, MILITARY SUPPLY SYSTEM] |
|
| BROCHURE OF THE ENGINEER SUPPLY SECTION COLUMBUS GENERAL DEPOT |
|
| [EXTRACT FROM WAR DEPARTMENT, OFFICE OF THE CHIEF OF ENGINEERS TO THE CHIEF ENGINEER, AFHQ REGARDING CONSTRUCTION; LOGISTICAL DATA] [WITH ATTACHMENT] |
|
| [COPY][DIAGRAM OF 180TH STATION HOSPITAL BOUSSIVILLE] [WITH ATTACHMENT] |
|
| [COPY][MAP OF VARIOUS HOSPITALS] |
|
| [COPY][LAYOUT PLAN FOR 74TH STATION HOSPITAL] |
|
| [COPY][LAYOUT IN HUTS & TENTS FOR 37TH GENERAL HOSPITAL] |
|
| [COPY][DIAGRAM OF FIRST FLOOR & MEZZANINE ALTERATIONS TO BUILDING PALAZZO DELL ARTE FOR 23RD GENERAL HOSPITAL] |
|
| [COPY][DIAGRAM OF HOSPITAL PROJECT, ASSI BOUNIE, UNITS LTO 3] |
|
| [COPY][DIAGRAM OF SECOND FLOOR, ALTERATIONS TO BUILDING PALAZZO DELL ART FOR 23RD GENERAL HOSPITAL] |
|
| [COPY][DIAGRAM OF THIRD FLOOR ALTERATIONS TO BUILDING PALAZZO DELL ART FOR 23RD GENERAL HOSPITAL] |
|
| [COPY][DIAGRAM OF BASEMENT FIRST FLOOR; PENTHOUSE ALTERATIONS TO BUILDING LIBRO GIORNALE FOR GENERAL HOSPITAL (23RD)] |
|
| [COPY][DIAGRAM OF 12X20 LATRINE PLAN FOR 3RD GENERAL HOSPITAL] |
|
| [COPY][MAP] ENGINEER DEPOT D, 113-P |
|
| [COPY][LAYOUT FOR ENGINEER DEPOT 2.50] |
|
| [COPY][LARGE BIRDS-EYE-VIEW SHOT OF BN AREAS FOR 1ST REPLACEMENT DEPOT] |
|
| [REPORT] MILITARY SUPPLY SYSTEM |
|
| [REPORT] STOCKING ACCOUNTING WITHIN THE ZONE OF THE INTERIOR |
|
| [REPORT] A SUMMARY EXPLANATION OF STOCK FUND ACCOUNTING PART II |
|
| [REPORT] A SUMMARY EXPLANATION OF STOCK FUND ACCOUNTING PART I |
|
| [REPORT] LOGISTICAL SUPPORT STUDY |
|
| [COPY][MEMORANDUM FROM UNDETERMINED TO COMMANDING GENERAL, THE ENGINEER CENTER REGARDING CORPS OF ENGINEERS ORGANIZATION FOR LOGISTICAL SUPPORT STUDY] |
|
| [OUTLINE] THE ENGINEER SUPPLY SYSTEM ARMY ENGINEERS CONFERENCE |
|
| [OUTLINE] THE ENGINEER SUPPLY SYSTEM ARMY ENGINEERS CONFERENCE |
|
| [STUDY OF CORPS OF ENGINEERS ORGANIZATION FOR LOGISTICAL SUPPORT] |
|
| [STUDY OF CORPS OF ENGINEERS ORGANIZATION FOR LOGISTICAL SUPPORT] |
|
| [STUDY OF CORPS OF ENGINEERS ORGANIZATION FOR LOGISTICAL SUPPORT] |
|
| [MEMORANDUM] BRIEF OUTLINE OF SOME BASIC CONCEPTS FOR STOCKAGE OF SPARE PARTS ITEMS OF SUPPLY |
|
| [PHOTOGRAPH, C/U SHOT OF 5 MEN WORKING UNDER A METAL BRIDGE] |
|
| PHOTOGRAPH W/S, PARTIAL BRIDGE CONSTRUCTION WITH CRANES IN DISTANT, IN FOREGROUND 2 SMALL CHILDREN ON ROCKY BANK WATCHING PEOPLE WORKING IN THE RIVER] |
|
| [REPORT] PUKHAN RIVER HI-LEVEL HIGHWAY BRIDGE, YANGSU-RHODE ISLAND CS 5156V [WITH ATTACHMENT] |
|
| [REPORT] PROJECT HISTORY, C.A.C. RECREATION CENTER, CHUNCHON , KOREA |
|
| [REPORT] CONSTRUCTION PROJECT HISTORY, 25000 GAL REIN CONCRETE WATER STORAGE TANK AT KAPYONG STATION |
|
| [REPORT] PROJECT HISTORY, C.A.C. P.X WAREHOUSE, CHUNCHON , KOREA |
|
| [MEMORANDUM FROM ROBERT B. KING TO THE COMMANDANT, THE ENGINEER SCHOOL REGARDING DOWNGRADING OF CLASSIFICATION PICTURES AND DRAWINGS][WITH ATTACHMENT] |
|
| [COMPLETION REPORT] SOYANG RIVER BRIDGE, KOREA, DT-218061 |
|
| [REPORT] MAJOR PROJECT HISTORY, IMJIN RIVER TEAL BRIDGE, 11 NOVEMBER - 23 DECEMBER 1951 |
|
| [REPORT] MAJOR PROJECT HISTORY, IMJIN RIVER TEAL BRIDGE, 11 NOVEMBER - 23 DECEMBER 1953 |
|
| [REPORT] MAJOR PROJECT HISTORY, IMJIN RIVER SHOO - FLY, 7 JANUARY 1952 - 15 FEBRUARY 1952, 13 MAY 1952 |
|
| [REPORT] MAJOR PROJECT HISTORY, IMJIN RIVER SHOO - FLY, 7 JANUARY 1952 - 15 FEBRUARY 1952, 13 MAY 1952 |
|
| [REPORT[ INJE PASS DEFILE, KOREA |
|
| [REPORT[ INJE PASS DEFILE, KOREA |
|
| [NEGATIVE COPY][REPORT] PROJECT COMPLETION REPORT, MUNMANG-NI BRIDGE[WITH ATTACHMENTS] |
|
| [REPORT] PROJECTION COMPLETION REPORT - MUNMANG-NI BRIDGE [WITH ATTACHMENTS] |
|
| [REPORT] PROJECT HISTORY, JAPAN CENTRAL EXCHANGE DEPOT, CHUNCHON, KOREA |
|
| [NEGATIVE COPY OF BLUEPRINTS OF PUKUAN RIVER HIGHWAY BRIDGE] |
|
| [COPY][BLUEPRINTS FOR 25000 GAL REINFORCED CONCRETE WATER STORAGE TANK, KAPYONG, " AS BUILT"] |
|
| [REPORT[ INJE PASS DEFILE, KOREA |
|
| [NEGATIVE COPY][REPORT] PROJECT COMPLETION REPORT, MUNMANG-NI BRIDGE[WITH ATTACHMENTS] |
|
| [COVER] MOJIN BRIDGE |
|
| [TABLE OF CONTENTS] |
|
| [MAP] MAP OF KOREA |
|
| [REPORT] NARRATIVE |
|
| [REPORT] CONCRETE FOUR DATA |
|
| [LIST] BILL OF MATERIALS |
|
| [LIST] MAJOR EQUIPMENT USED ON PROJECT |
|
| [LIST] PERSONNEL AND CONTRACTORS CONCERNED WITH PROJECT |
|
| [REPORT] OPERATIONS ORDER INITIATING WORK |
|
| [OUTLINE] SCHEDULE "A" [WITH ATTACHMENTS] |
|
| [PHOTOGRAPH WIDE SHOT OF LARGE METAL PIECES UNDERNEATH MOJIN BRIDGE NEAR A BODY OF WATER WITH ATTACHMENTS] |
|
| [DIAGRAM] REPAIR AND WIDENING [WITH ATTACHMENTS] |
|
| [COVER] MOJIN BRIDGE [WITH ATTACHMENT] |
|
| [TABLE OF CONTENTS] |
|
| [MAP] MAP OF KOREA |
|
| [REPORT] NARRATIVE |
|
| [REPORT] CONCRETE FOUR DATA |
|
| [LIST] BILL OF MATERIALS |
|
| [LIST] MAJOR EQUIPMENT USED ON PROJECT |
|
| [LIST] PERSONNEL AND CONTRACTORS CONCERNED WITH PROJECT |
|
| [REPORT] OPERATIONS ORDERS INITIATING WORK |
|
| [OUTLINE] SCHEDULE "A" [WITH ATTACHMENTS] |
|
| [COPY OF PHOTOGRAPH WIDE SHOT OF LARGE METAL PIECES UNDERNEATH MOJIN BRIDGE NEAR A BODY OF WATER WITH ATTACHMENTS] |
|
| [DIAGRAM] REPAIR AND WIDENING [WITH ATTACHMENTS] |
|
| [COVER] SU-SONG BRIDGE |
|
| [TABLE OF CONTENTS] |
|
| [MAP] OVERLAY; TAEGU, KOREA |
|
| [REPORT] NARRATIVE |
|
| [ISSUE SLIP FROM ENGINEER SUPPLY OFFICE TO 74TH ENGINEER HEAVY EQUIPMENT COMPANY REGARDING MATERIALS] |
|
| [LIST] BILL OF MATERIALS [WITH ATTACHMENT] |
|
| [DISPOSITION FORM FROM EDWARD J. BIELECKI TO 74TH ENGINEER HEAVY EQUIPMENT COMPANY REGARDING BILL OF MATERIALS FOR SU SONG BRIDGE WITH ATTACHMENTS] |
|
| [LIST] MATERIALS SALVAGED AFTER CONSTRUCTION OF SU SONG BRIDGE |
|
| [LIST] TYPE OF EQUIPMENT USED IN CONSTRUCTION |
|
| [ORDERS] EXTRACT COPY OF OPERATION ORDER NUMBER 2 [WITH ATTACHMENTS] |
|
| [OUTLINE] SCHEDULE "A" FOR THE CONSTRUCTION OF THE SU-SONG BRIDGE |
|