| [REPORT] REPORT ON RIVER CROSSING TECHNIQUE |
|
| [BOOKLET] ASSAULT COURSE, REPORT ON THE COMMITTEE OF BARRIER TACTICS |
|
| [REPORT] A REPORT ON FIELD FORTIFICATIONS (DELIBERATE) |
|
| [BOOKLET] SPECIAL TEXT NO. 122 TACTICS AND COMBAT PRINCIPLES |
|
| [COVER] INFANTRY DIVISION BATTLE GROUP FIELD DEFENSE STUDY [WITH ATTACHMENTS] |
|
| [TABLE OF CONTENTS] |
|
| [REPORT] INFANTRY DIVISION BATTLE GROUP FIELD DEFENSE STUDY |
|
| [CHART] ORGANIZATION OF THE BATTLE GROUP WITH ITS NORMAL ATTACHED AND SUPPORTING UNITS |
|
| [REPORT] ANNEX A - PRIMARY ACTIVITIES OF INDIVIDUALS IN THE BATTLE GROUP AREA |
|
| [REPORT] ANNEX B - SHELTERS AND EMPLACEMENTS |
|
| [REPORT] ANNEX C - VULNERABILITY SYSTEM |
|
| [REPORT] ANNEX D - SEQUENCE OF FIELD FORTIFICATIONS CONSTRUCTION |
|
| [REPORT] ANNEX E - ACHIEVING FIELD PROTECTION |
|
| [REPORT] ANNEX F - RESEARCH AND DEVELOPMENT |
|
| [REPORT] ANNEX G - REFERENCES |
|
| [BOOKLET] MILITARY ROADS AND TRAFFIC CONTROL |
|
| [CORRESPONDENCE FROM S. C. GODFREY REGARDING OBSTACLES TO IMPEDE AND STOP THE MOVEMENT OF MECHANIZED FORCES WITH ATTACHMENTS] |
|
| [CORRESPONDENCE FROM THOMAS W. ALVEY TO 8TH ENGINEER BATTALION REGARDING ICE TRAFFICABILITY AND BRIDGING WITH ATTACHMENTS] |
|
| [BOOKLET] THE PRACTICABILITY AND ADVANTAGES OF AIR RECONNAISSANCE FOR THE MILITARY ENGINEER [WITH ATTACHMENT] |
|
| [CORRESPONDENCE FROM JAMES W. LAVERETTE TO J. S. GORLINSKI REGARDING JOB ENGINEERING EXAMPLE [WITH ATTACHMENT] |
|
| [MEMORANDUM FROM CHARLES S. RUNYAN REGARDING JOB ENGINEERING WITH ATTACHMENT] |
|
| [REPORT] A STUDY IN RUNWAY LOCATION, DESIGN, AND COMPUTATION [WITH ATTACHMENTS] |
|
| [BOOKLET] SPECIAL TEXT NO. 115 ORGANIZATION OF THE GROUND AND FIELD FORTIFICATIONS |
|
| [COPY][ENVELOPE REGARDING PROGRAM NOTES, THE TACTICAL EMPLOYMENT OF THE COMBAT ENGINEER REGIMENT (MAP PROBLEM)] |
|
| [MEMORANDUM FROM HEADQUARTERS, THE ENGINEER SCHOOL, OFFICE OF THE COMMANDANT TO INSTRUCTORS, CONFERENCE COURSE FOR NATIONAL GUARD; RESERVE OFFICERS REGARDING PROBLEM NO. 8-A RIVER CROSSING (MAP PROBLEM)] [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 7-THE EMPLOYMENT OF THE GENERAL SERVICE REGIMENT [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 6-USE OF ENGINEERS AS RIFLEMEN (MAP PROBLEM) [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 6-USE OF ENGINEERS AS RIFLEMEN (MAP PROBLEM) [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 5-INFANTRY IN A MEETING ENGAGEMENT (MAP PROBLEMS) [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 4-TERRAIN (MAP PROBLEM) [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 5-TERRAIN (MAP PROBLEM) [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 3-COMMAND AND STAFF DUTIES (MAP MANEUVER) [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 2-THE EMPLOYMENT OF THE ENGINEER SEPARATE BATTALION (MAP PROBLEM) |
|
| [NOTES] PROBLEM NO. 2-THE EMPLOYMENT OF THE ENGINEER SEPARATE BATTALION (MAP PROBLEM) |
|
| [NOTES] PROBLEM NO. 1-THE TACTICAL EMPLOYMENT OF THE COMBAT ENGINEER REGIMENT (MAP PROBLEM) [WITH ATTACHMENTS] |
|
| [COPY][ENVELOPE REGARDING NO. 5 MAP MANEUVER-THE ENGINEER SQUADRON IN ADVANCE; ATTACK] |
|
| [NOTES] PROBLEM NO. 4-FIELD FORTIFICATION AND CAMOUFLAGE [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 5-THE ENGINEER SQUADRON IN ADVANCE AND ATTACK [WITH ATTACHMENTS] |
|
| [COPY][ENVELOPE REGARDING PROBLEM NO.2-DUTIES OF ENGINEERS IN AN ATTACK (MAP MANEUVER-THE STAFF OF THE COMBAT REGIMENT) ALSO PROBLEM 1 & 3] |
|
| [NOTES] PROBLEM NO. 1-DUTIES OF ENGINEERS IN AN ATTACK [WITH ATTACHMENTS] |
|
| [OVERLAY NO.2] 5TH DIVISION TENTATIVE ROAD CIRCULATION PLAN FOR 17 JUNE SHOWING FIRST PRIORITY ROADS [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 3-DUTIES OF ENGINEERS IN DEFENSE [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 2-DUTIES OF ENGINEERS IN AN ATTACK [WITH ATTACHMENTS] |
|
| [COPY][ENVELOPE REGARDING TR.1-10. JANUARY 2, 1935. TRAG . PUBS LIST.] |
|
| [NOTES] PROBLEM NO. 8-CONSTRUCTION IN WAR [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 7-CORPS ENGINEER FORCE |
|
| [NOTES] PROBLEM NO. 6-HEADQUARTERS & SERVICE COMPANY (COMBAT REGIMENT) [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 5-ENGINEER SUPPLY (S-4 STAFF EXERCISE) [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 4-WATER SUPPLY [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 4-WATER SUPPLY [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 3-DUTIES OF ENGINEERS IN AN ATTACK [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 2-DUTIES OF ENGINEERS IN AN ADVANCE [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO.2-DUTIES OF ENGINEERS IN AN ADVANCE [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 1-BIVOUACS |
|
| [COPY][ENVELOPE REGARDING LETT NO. 217209-A/3] |
|
| [NOTES] PROBLEM NO. 7 RIVER CROSSING [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 6-RIVER CROSSING [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 5-CONSTRUCTION IN WAR [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 4-MILITARY ROADS [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 3-MILITARY BRIDGES [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 2-FIELD FORTIFICATIONS [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 1-FIELD FORTIFICATIONS [WITH ATTACHMENTS] |
|
| [COPY][ENVELOPE REGARDING PROBLEM NO. 2-TRAINING PROGRAMS; TRAINING SCHEDULES, PROBS.1-5 INCL. 1934-1935] |
|
| [NOTES] PROBLEM NO. 5-TROOP MOVEMENTS BY RAIL AND TRUCK [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 4-THE CORPS ENGINEER FORCE IN AN ADVANCE (MAP MANEUVER) [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 4-THE CORPS ENGINEER FORCE IN AN ADVANCE (MAP MANEUVER) [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 3-ENGINEER RECONNAISSANCE, COMBAT REGIMENT. (MAP PROBLEM) [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 2-TRAINING PROGRAMS AND TRAINING SCHEDULES (MAP PROBLEM) [WITH ATTACHMENTS] |
|
| [NOTES] PROBLEM NO. 1-MOBILIZATION AND ADMINISTRATION (MAP MANEUVER) [WITH ATTACHMENTS] |
|
| [BOOKLET "THE BAILEY BRIDGE ADAPTED FOR RAIL TRAFFIC"] |
|
| [REPORT "ENGINEER HISTORY (FIRST ARMY) OF THE NORTH AMERICAN CAMPAIGN NOVEMBER 42 TO MAY 43"] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; "COMPONENTS FOR ROADWAY ON ROAD-RAIL BRIDGES"] TABLE F.II |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; "COMPONENTS FOR ONE MULTIPLE FLOATING PILE RIG"] TABLE H.III |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; DRAWINGS - PLATES 8-23] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; DRAWINGS - PLATES 30A-41J] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; DRAWINGS - PLATES 42 - 72] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; DRAWINGS - PLATES 77 - 80] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; DRAWINGS - PLATES 83 - 92B] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; DRAWINGS - PLATES 94 - 104] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; DRAWINGS - PLATES 106 - 112] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; DRAWING - PLATE 114] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; "DETAILS OF UNITS, PLATES 115 - 167" DRAWINGS - PLATE 115 - 167] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; "E.S.T.B. TABLE OF BRIDGE WEIGHTS" TABLES 1 - 4] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; "COMPONENTS FOR ONE CREEPER CRANE" TABLE 6] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; "COMPOSITION OF STANDARD PACKS" TABLE 24] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; "TABLE OF COMPONENTS FOR 1 NO. V-TRESTLE GANTRY" TABLE 29] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; "PLATES AND TABLES REFERENCED IN APPENDICES"] |
|
| [REPORT "THE EVERALL SECTIONAL TRUSS RAILWAY BRIDGE"; DRAWING - PLATES DI THROUGH WI] |
|
| [REPORT "DESCRIPTION & HISTORY OF ARNHEM BRIDGE"] |
|
| [REPORT "DAMAGED ARCHED VIADUCTS THE UNBALANCED HORIZONTAL THRUST"] ["REPAIRS TO DAMAGED ARCH VIADUCTS - METHODS OF TAKING UP UNBALANCED HORIZONTAL THRUST - INTRODUCTION"] [DRAWING FIG NO. 3 |
|
| [REPORT "DAMAGED ARCHED VIADUCTS THE UNBALANCED HORIZONTAL THRUST"] [DRAWING TENSION COUPLING FOR USE WITH RAIL TIES AS USED BY SOUTHERN RAILWAY FIG NO. 4] |
|
| [REPORT "DAMAGED ARCHED VIADUCTS THE UNBALANCED HORIZONTAL THRUST"] [DRAWING PLATE NO. 2] |
|
| [REPORT "DAMAGED ARCHED VIADUCTS THE UNBALANCED HORIZONTAL THRUST"] [DRAWING PLATE NO. 8] |
|
| [REPORT "DAMAGED ARCHED VIADUCTS THE UNBALANCED HORIZONTAL THRUST"] [DRAWINGS PLATES NO. 9,10] |
|
| [REPORT "DAMAGED ARCHED VIADUCTS THE UNBALANCED HORIZONTAL THRUST"] [DRAWING PLATE NO. 12] |
|
| [REPORT "DAMAGED ARCHED VIADUCTS THE UNBALANCED HORIZONTAL THRUST"] [DRAWING PLATE NO. 13] |
|
| [TITLE PAGE] TRIAL REPORT, S.M.E. TRIAL, SERIAL 55/P, FEBRUARY '56, TRACTOR CRAWLER, INTERNATIONAL HARVESTER WITH ANCILLARIES |
|
| [CORRESPONDENCE FROM JOHN F. KIMBEL TO THE CHIEF OF ENGINEERS REGARDING TRIAL REPORT ON TRACTOR CRAWLER INTERNATIONAL HARVESTER WITH ANCILLARIES] |
|
| [TITLE PAGE] TRIAL REPORT, S.M.E. TRIAL, SERIAL 55/P, FEBRUARY '56, TRACTOR CRAWLER, INTERNATIONAL HARVESTER MODEL BTD6 |
|
| [INDEX PAGE] |
|