| NOTES ON ENGINEER OPERATIONS IN ITALY NUMBER 19 |
|
| NOTES ON ENGINEER OPERATIONS IN ITALY NUMBER 20 |
|
| NOTES ON ENGINEER OPERATIONS IN ITALY NUMBER 21 |
|
| NOTES ON ENGINEER OPERATIONS IN ITALY NUMBER 22 |
|
| NOTES ON ENGINEER OPERATIONS IN ITALY NUMBER 23 |
|
| NOTES ON ENGINEER OPERATIONS IN ITALY NUMBER 24 |
|
| NOTES ON ENGINEER OPERATIONS IN ITALY NUMBER 25 |
|
| NOTES ON ENGINEER OPERATIONS IN ITALY NUMBER 26 |
|
| NOTES ON ENGINEER OPERATIONS IN ITALY NUMBER 27 |
|
| NOTES ON ENGINEER OPERATIONS IN ITALY NUMBER 28 |
|
| [REPORT] 499TH ENGINEER COMBAT RIVER SWINGING BRIDGES BETWEEN KARLSRUHE AND MANHEIM |
|
| [REPORT] RHINE RIVER SWINGING BRIDGES OF THE 499TH ENGINEER BATTALION 1952/1957 |
|
| [REPORT] RHINE RIVER SWINGING BRIDGES OF THE 499TH ENGINEER BATTALION 1952/1957 |
|
| ENGINEER INTELLIGANCE NOTES NUMBER 21 |
|
| ENGINEER INTELLIGANCE NOTES NUMBER 24 |
|
| ENGINEER INTELLIGANCE NOTES NUMBER 25 |
|
| ENGINEER INTELLIGANCE NOTES NUMBER 26 |
|
| ENGINEER INTELLIGANCE NOTES NUMBER 27 |
|
| REPORT NO. 23 OBSERVATIONS ON INVASION OF FRANCE AND FALL OF CHERBOURG |
|
| [REPORT] AIRFIELD CONSTRUCTION ARCTIC AND SUB-ARCTIC REGIONS, ALASKA |
|
| [REPORT] AIRFIELD CONSTRUCTION ARCTIC AND SUB-ARCTIC REGIONS, ALASKA |
|
| [REPORT] AIRFIELD CONSTRUCTION ARCTIC AND SUB-ARCTIC REGIONS, ALASKA |
|
| [REPORT] AIRFIELD CONSTRUCTION ARCTIC AND SUB-ARCTIC REGIONS, ALASKA |
|
| [REPORT] CONSTRUCTION PROJECTS IN KOREA |
|
| [REPORT] CONSTRUCTION PROJECTS IN KOREA |
|
| [REPORT] CONSTRUCTION PROJECTS IN KOREA |
|
| [REPORT] CONSTRUCTION PROJECTS IN KOREA |
|
| [REPORT] CONSTRUCTION PROJECTS IN KOREA |
|
| [REPORT] CONSTRUCTION PROJECTS IN KOREA |
|
| PROJECT COMPLETION REPORT |
|
| PROJECT COMPLETION REPORT |
|
| [REPORT] CONSTRUCTION PROJECT HISTORY, X CORPS MSR [WITH ATTACHMENT] |
|
| [PHOTOGRAPH WIDE SHOT OF A BRIDGE IN A BODY OF WATER WITH SEVERAL MEN WORKING ON AND AROUND IT [WITH ATTACHMENTS] |
|
| [DIAGRAM] RECONSTRUCTION - REINF. CONC. BRIDGE WONJU, KOREA [WITH ATTACHMENTS] |
|
| [TITLE PAGE] CONSTRUCTION PROJECT HISTORY OF "WILBERT ROAD" |
|
| [REPORT] CONSTRUCTION PROJECT HISTORY OF "WILBERT ROAD" |
|
| [REPORT] ENGINEER COMPLETION REPORT ON TRAM NUMBER 2 [WITH ATTACHMENTS] |
|
| [REPORT] CONSTRUCTION PROJECT HISTORY, X CORPS MSR |
|
| [DIAGRAM] RECONSTRUCTION - REINF. CONC. BRIDGE WONJU, KOREA [WITH ATTACHMENTS] |
|
| [REPORT] CONSTRUCTION PROJECT HISTORY, BRIGADIER GENERAL L. K. LADUE BRIDGE, SOYANG RIVER - PUPYONG-NI, KOREA |
|
| [DIAGRAM] SOYANG RIVER BAILEY BRIDGE |
|
| [REPORT] ANNEX "B" TO RHINE AND LIPPE BRIDGE REPORT |
|
| [REPORT] RHINE RIVER CROSSINGS - NAVY REPORT OF ACTION |
|
| [REPORT] ANALYSIS OF TROOPS, EQUIPMENT AND TASKS INVOLVED PER CORPS IN CROSSING OF THE RHINE RIVER |
|
| [MAP] MAP OF RHINE HIGHWAY BRIDGES |
|
| [REPORT] HANDBOOK OF HYDRAULICS |
|
| [REPORT] PLASTIC SCREENS BEING TESTED AT CORPS OF ENGINEER RESEARCH LABS |
|
| [REPORT] ALUMINUM BRIDGE FOR ARMY STACKS UP MORE TRICKS THAN ANY OTHER TACTICAL BRIDGE |
|
| [REPORT] ARMY ENGINEERS DEVELOP NEW LIGHTING EQUIPMENT SETS |
|
| [REPORT] ARMY ENGINEERS TEST INTERCHANGEABLE BULLDOZER ATTACHMENTS |
|
| [REPORT] NEW SERIES OF MILITARY BRIDGES DEVELOPED BY ARMY CORPS OF ENGINEERS |
|
| PICTORIAL OUTLINE OF THE ENGINEER RESEARCH AND DEVELOPMENT LABORATORIES BRIDGE DEVELOPMENT PROGRAM |
|
| REPORT ON ARCTIC MAINTENANCE |
|
| [REPORT] FLOOD CONTROL OF THE MISSISSIPPI RIVER IN ITS ALLUVIAL VALLEY |
|
| [MEMORANDUM] NARRATIVE HISTORICAL REPORT |
|
| [MEMORANDUM] NARRATIVE HISTORICAL REPORT |
|
| [REPORT] COMMAND REPORT OF THE 78TH ENGINEER COMBAT BATTALION |
|
| [REPORT] ACTIVITIES REPORT FROM 1 JULY 50 TO 31 JULY 50 |
|
| [REPORT] ACTIVITIES REPORT FROM 1 JULY 50 TO 31 JULY 50 |
|
| [REPORT] ANNUAL HISTORICAL REPORT |
|
| [REPORT] ANNUAL HISTORICAL REPORT |
|
| [REPORT] CALENDAR YEAR NARRATIVE REPORT OF THE 80TH ENGINEER BASE DEPOT COMPANY FOR THE PERIOD 1 JANUARY 1950 TO 31 DECEMBER 1950 |
|
| [REPORT] CALENDAR YEAR NARRATIVE REPORT OF THE 80TH ENGINEER BASE DEPOT COMPANY FOR THE PERIOD 1 JANUARY 1950 TO 31 DECEMBER 1950 |
|
| [MEMORANDUM] HISTORICAL REPORT |
|
| [MEMORANDUM] HISTORICAL REPORT |
|
| [REPORT] CORRECTED CALENDAR YEAR NARRATIVE REPORT |
|
| [REPORT] UNIT REPORT NO. 1 - PERIOD COVERED: 10001 JANUARY 50 TO 312400 DECEMBER 1950 |
|
| [MEMORANDUM] REPORT OF ACTIVITIES |
|
| [MEMORANDUM] REPORT OF TRAINING AND OPERATIONAL ACTIVITIES, PERIOD 1 APRIL THRU 14 APRIL 1950 |
|
| [MEMORANDUM] REPORT OF TRAINING AND OPERATIONAL ACTIVITIES, PERIOD 18 MARCH THRU 31 MARCH 1950 |
|
| [MEMORANDUM] REPORT OF TRAINING AND OPERATIONAL ACTIVITIES, PERIOD 4 MARCH 1950 THRU 18 MARCH 1950 |
|
| [MEMORANDUM] REPORT OF TRAINING AND OPERATIONAL ACTIVITIES, PERIOD 18 FEBRUARY 1950 THRU 3 MARCH 1950 |
|
| [MEMORANDUM] REPORT OF TRAINING AND OPERATIONAL ACTIVITIES, PERIOD 4 FEBRUARY 1950 THRU 17 FEBRUARY 1950 |
|
| [MEMORANDUM] REPORT OF TRAINING AND OPERATIONAL ACTIVITIES, PERIOD 7 JANUARY 1950 THRU 20 JANUARY 1950 |
|
| [MEMORANDUM] REPORT OF TRAINING AND OPERATIONAL ACTIVITIES, PERIOD 24 DECEMBER 1949 THRU 6 JANUARY 1950 |
|
| [MEMORANDUM] REPORT OF TRAINING AND OPERATIONAL ACTIVITIES, PERIOD 21 JANUARY 1950 THRU 3 FEBRUARY 1950 |
|
| [MEMORANDUM] TRAINING BACKGROUND |
|
| [FORM] DISPOSITION FORM |
|
| [MEMORANDUM] ENGR TRAINING POLICY [WITH ATTACHMENTS] |
|
| [MEMORANDUM] ENGINEER TRAINING POLICY [WITH ATTACHMENTS] |
|
| [CHART] MANPOWER UTILIZATION |
|
| [MEMORANDUM] ENGINEER TRAINING POLICY [WITH ATTACHMENTS] |
|
| [MEMORANDUM] ENGINEER TRAINING POLICY [WITH ATTACHMENTS] |
|
| [MEMORANDUM] RESPONSIBILITIES FOR SERVICE UNITS |
|
| [MEMORANDUM] RESPONSIBILITIES FOR SERVICE UNITS |
|
| [MEMORANDUM] REGARDING THE ORGANIZATION, EQUIPMENT, TRAINING, PERSONNEL & PROBLEMS OF THE 83RD ENGINEER CONSTRUCTION BATTALION, FORT SILL, OKLAHOMA |
|
| [MEMORANDUM] ITEMS INTERFERING WITH TRAINING OF 83RD ECB |
|
| [LIST] MISCELLANEOUS DETAILS |
|
| [MEMORANDUM] TRAINING OF ENGINEER UNITS |
|
| [MEMORANDUM] ORGANIZATIONAL AND TRAINING OBJECTIVES OF THE 83RD ENGINEER CONSTRUCTION BATTALION |
|
| [MEMORANDUM] TRAINING OF ENGINEER UNITS |
|
| [LIST] BILL OF MATERIAL AND REFERENCES FOR BRIDGE, HIGHWAY CLASS 50, TWO LANE; CLASS 80, SINGLE LANE (120" 0") |
|
| [FORM] DISPOSITION FORM - TAB "K" SAME AS TAB "D", THEREFORE WITHDRAWN |
|
| [FORM] DISPOSITION FORM - TAB "L" WITHDRAWN - APPLICABLE TO 71ST ENGR MAINT CO ONLY |
|
| [FORM] DISPOSITION FORM - TAB "M" WITHDRAWN - APPLICABLE TO 71ST ENGR MAINT CO ONLY |
|
| [FORM] DISPOSITION FORM - TAB "N" WITHDRAWN - APPLICABLE TO 71ST ENGR MAINT CO ONLY |
|
| [FORM] DISPOSITION FORM - TAB "O" WITHDRAWN - APPLICABLE TO 71ST ENGR MAINT CO ONLY |
|
| [REPORT] STANDARD OPERATING PROCEDURE #1 - 83RD ENGINEER CONSTRUCTION BATTALION |
|
| [LIST] RECURRING REPORTS TO HIGHER HEADQUARTERS |
|
| [MANUAL] AIRFIELD-HELIPORT FLEXIBLE PAVEMENT DESIGN |
|
| ENGINEER INTELLIGENCE SUMMARY NO. 66 |
|