| [MEMORANDUM] REGARDING THE ORGANIZATION, EQUIPMENT, TRAINING, PERSONNEL & PROBLEMS OF THE 83RD ENGINEER CONSTRUCTION BATTALION, FORT SILL, OKLAHOMA |
|
| [MEMORANDUM] ITEMS INTERFERING WITH TRAINING OF 83RD ECB |
|
| [LIST] MISCELLANEOUS DETAILS |
|
| [MEMORANDUM] TRAINING OF ENGINEER UNITS |
|
| [MEMORANDUM] ORGANIZATIONAL AND TRAINING OBJECTIVES OF THE 83RD ENGINEER CONSTRUCTION BATTALION |
|
| [MEMORANDUM] TRAINING OF ENGINEER UNITS |
|
| [LIST] BILL OF MATERIAL AND REFERENCES FOR BRIDGE, HIGHWAY CLASS 50, TWO LANE; CLASS 80, SINGLE LANE (120" 0") |
|
| [FORM] DISPOSITION FORM - TAB "K" SAME AS TAB "D", THEREFORE WITHDRAWN |
|
| [FORM] DISPOSITION FORM - TAB "L" WITHDRAWN - APPLICABLE TO 71ST ENGR MAINT CO ONLY |
|
| [FORM] DISPOSITION FORM - TAB "M" WITHDRAWN - APPLICABLE TO 71ST ENGR MAINT CO ONLY |
|
| [FORM] DISPOSITION FORM - TAB "N" WITHDRAWN - APPLICABLE TO 71ST ENGR MAINT CO ONLY |
|
| [FORM] DISPOSITION FORM - TAB "O" WITHDRAWN - APPLICABLE TO 71ST ENGR MAINT CO ONLY |
|
| [REPORT] STANDARD OPERATING PROCEDURE #1 - 83RD ENGINEER CONSTRUCTION BATTALION |
|
| [LIST] RECURRING REPORTS TO HIGHER HEADQUARTERS |
|
| [MANUAL] AIRFIELD-HELIPORT FLEXIBLE PAVEMENT DESIGN |
|
| ENGINEER INTELLIGENCE SUMMARY NO. 66 |
|
| ENGINEER INTELLIGENCE SUMMARY NO. 67 |
|
| ENGINEER INTELLIGENCE SUMMARY NO. 69 |
|
| ENGINEER INTELLIGENCE SUMMARY NO. 70 |
|
| ENGINEER INTELLIGENCE SUMMARY NO. 71 |
|
| ENGINEER INTELLIGENCE SUMMARY NO. 72 |
|
| ENGINEER INTELLIGENCE SUMMARY NO. 73 |
|
| ENGINEER INTELLIGENCE SUMMARY NO. 75 |
|
| APPENDIX IV AS BUILT DRAWINGS TAXIWAY PARKING APRON BUILDING PAD |
|
| [REPORT] CONSTRUCTION AT AIR CORPS STATIONS, SUMMARIES OF PROGRESS, BI-MONTHLY [WITH ATTACHMENTS] |
|
| [REPORT] CONSTRUCTION AT AIR CORPS STATIONS, SUMMARIES OF PROGRESS, BI-MONTHLY [WITH ATTACHMENTS] |
|
| [REPORT] CONSTRUCTION AT AIR CORPS STATIONS, SUMMARIES OF PROGRESS, BI-MONTHLY [WITH ATTACHMENTS] |
|
| [REPORT] CONSTRUCTION AT AIR CORPS STATIONS, SUMMARIES OF PROGRESS, BI-MONTHLY [WITH ATTACHMENTS] |
|
| [REPORT] CONSTRUCTION AT AIR CORPS STATIONS, SUMMARIES OF PROGRESS, BI-MONTHLY [WITH ATTACHMENTS] |
|
| [REPORT] TECHNIQUES FOR RAPID ROAD CONSTRUCTION USING MEMBRANE-ENVELOPED SOIL LAYERS |
|
| [REPORT] TECHNIQUES FOR RAPID ROAD CONSTRUCTION USING MEMBRANE-ENVELOPED SOIL LAYERS |
|
| AIRPORT CONSTRUCTION WITH HEAVY EQUIPMENT |
|
| CHAPTER THIRTEEN [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| CHAPTER FOURTEEN [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| CHAPTER FIFTEEN [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| CHAPTER SIXTEEN [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| CHAPTER SEVENTEEN [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| CHAPTER EIGHTEEN [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| CHAPTER NINETEEN [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| CHAPTER TWENTY [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| CHAPTER TWENTY-ONE [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| CHAPTER TWENTY-TWO [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| CHAPTER TWENTY-THREE [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| CHAPTER TWENTY-FOUR [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| CHAPTER TWENTY-FIVE [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| CHAPTER TWENTY-SIX [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| CHAPTER TWENTY-SEVEN [OF] ENGINEER INTELLIGENCE GUIDE NUMBER ONE |
|
| ENGINEER INTELLIGENCE SUMMARY NUMBER 30 |
|
| ENGINEER INTELLIGENCE SUMMARY NUMBER 31 |
|
| ENGINEER INTELLIGENCE SUMMARY NUMBER 32 |
|
| ENGINEER INTELLIGENCE SUMMARY NUMBER 33 |
|
| [COPY][MEMORANDUM FROM DEPARTMENT OF THE AIR FORCE, HEADQUARTERS, UNITED STATES AIR FORCE TO ASSISTANT CHIEF OF STAFF, INSTALLATIONS, UNITED STATES AIR FORCE REGARDING REPORT OF THE AIR CONSTRUCTION BOARD] |
|
| [COPY][MEMORANDUM FROM DEPARTMENT OF THE AIR FORCE TO PERSONNEL CONCERNED REGARDING LETTER ORDER C-507] |
|
| [COPY][MEMORANDUM FROM DEPARTMENT OF THE AIR FORCE TO PERSONNEL CONCERNED REGARDING LETTER ORDER C-694] |
|
| [REPORT] DIRECTIVES |
|
| [REPORT] DIRECTIVES |
|
| [REPORT] DIRECTIVES |
|
| REPORT ON WESER-ELBE CANAL & ELBE RIVER BRIDGES |
|
| REPORT ON WESER-ELBE CANAL & ELBE RIVER BRIDGES |
|
| [REPORT] FLASHPOINT BY DEBONAIR [WITH ATTACHMENT] |
|
| [REPORT] FLASHPOINT BY DEBONAIR [WITH ATTACHMENT] |
|
| [REPORT] FO NO. 3, CH 1 TO ADM 01 TO ACCOMPANY FO 3 MAPS [WITH ATTACHMENTS] |
|
| [REPORT] FO NO. 3, CH 1 TO ADM 01 TO ACCOMPANY FO 3 MAPS [WITH ATTACHMENTS] |
|
| [REPORT] FO NO. 3, CH 1 TO ADM 01 TO ACCOMPANY FO 3 MAPS [WITH ATTACHMENTS] |
|
| [REPORT] FO NO. 3, CH 1 TO ADM 01 TO ACCOMPANY FO 3 MAPS [WITH ATTACHMENTS] |
|
| [BOOKLET] "ENGINEER TECHNICAL AND TECHNOLOGICAL SURVEY JAPANESE LAND MINE DETECTORS" |
|
| [REPORT] CONSOLIDATED R & D ANNUAL PROJECT REPORT VOLUME II |
|
| [REPORT] CONSOLIDATED R & D ANNUAL PROJECT REPORT VOLUME II |
|
| [REPORT] CONSOLIDATED R & D ANNUAL PROJECT REPORT VOLUME II |
|
| [REPORT] CONSOLIDATED R & D ANNUAL PROJECT REPORT VOLUME I |
|
| [REPORT] CONSOLIDATED R & D ANNUAL PROJECT REPORT VOLUME I |
|
| [REPORT] CONSOLIDATED R & D ANNUAL PROJECT REPORT VOLUME I |
|
| [CHART] CORPS OF ENGINEERS PROTOTYPE ENVANAL CHART |
|
| [REPORT] ENGINEERING AND DEVELOPMENT DIVISION ANNUAL REPORT FOR THE FISCAL YEAR 1944 |
|
| [COVER SHEET] STAFF TABLES OF FUNCTIONAL COMPONENTS SYSTEM FOR COMPUTING ARMY LOGISTIC SUPPORT REQUIREMENTS |
|
| [COVER SHEET REGARDING LIBRARY] |
|
| [OUTLINE] INTRODUCTION TO THE FUNCTIONAL COMPONENTS SYSTEM |
|
| [CHART] SIGNIFICANCE OF LETTER DESIGNATION - TYPE COMPONENT [WITH ATTACHMENTS] |
|
| [INDEX] INDEX TO FACILITY NUMBERS |
|
| [OUTLINE] EXPLANATION AND SUGGESTED USE OF THE STAFF TABLES AND MACHINE RECORD CARDS FOR DETERMINING ENGINEER SUPPLY REQUIREMENTS |
|
| [INDEX] INDEX TO INDEPENDENT FACILITY NUMBER |
|
| [TABLE] LIST OF AVAILABLE INDEPENDENT FACILITIES |
|
| [TABLE REGARDING COMPONENT: ADMINISTRATION, 10,000 SQUARE FEET, STD 2, TEMP, TENTAGE; COMPONENT NUMBER A 1.201] |
|
| [TABLE REGARDING COMPONENT: ADMINISTRATION, 10,000 SQUARE FEET, STD 5, TEMP, STD FRAME; COMPONENT NUMBER A 1.521] |
|
| [TABLE REGARDING COMPONENT: ADMINISTRATION, 10,000 SQUARE FEET, STD 6, TEMP, STD FRAME; COMPONENT NUMBER A 1.621] |
|
| [TABLE REGARDING COMPONENT: ADMINISTRATION, 10,000 SQUARE FEET, CONVERSION, STD 5 TO STD 6, TEMP, STD FRAME; COMPONENT NUMBER A 1.641] |
|
| [TABLE REGARDING COMPONENT: ADMINISTRATION, 25,000 SQUARE FEET, STD 5, TEMP, STD FRAME; COMPONENT NUMBER A 2.521] |
|
| [TABLE REGARDING COMPONENT: ADMINISTRATION, 25,000 SQUARE FEET, STD 5, REHABILITATION; COMPONENT NUMBER A 2.581] |
|
| [TABLE REGARDING COMPONENT: ADMINISTRATION, 25,000 SQUARE FEET, STD 6, TEMP., STD. FRAME; COMPONENT NUMBER A 2.621] |
|
| [TABLE REGARDING COMPONENT: ADMINISTRATION, 25,000 SQUARE FEET, CONVERSION, STD 5 TO STD 6, TEMP. STD. FRAME; COMPONENT NUMBER A 2.641] |
|
| [TABLE REGARDING COMPONENT: ADMINISTRATION, 25,000 SQUARE FEET, STD 6, REHABILITATION; COMPONENT NUMBER A 2.681] |
|
| [TABLE REGARDING COMPONENT: ADMINISTRATION, 50,000 SQUARE FEET., STD 5, TEMP., STD. FRAME; COMPONENT NUMBER A 3.521] |
|
| [TABLE REGARDING COMPONENT: ADMINISTRATION, 50,000 SQUARE FEET., STD 6, TEMP., STD. FRAME; COMPONENT NUMBER A 3.621] |
|
| [TABLE REGARDING COMPONENT: ADMINISTRATION, 50,000 SQUARE FOOT CONVERSION, STD 5 TO STD 6, TEMP, STD FRAME; COMPONENT NUMBER A 3.641] |
|
| [TABLE REGARDING COMPONENT: PERSONNEL SERVICES, BASE POST OFFICE, 20,000 SQ. FT. NC; COMPONENT NUMBER AP 1.521] |
|
| [TABLE REGARDING COMPONENT: PERSONNEL SERVICES, BASE POST OFFICE, 40,000 SQ. FT. NC; COMPONENT NUMBER AP 2.521] |
|
| [TABLE REGARDING COMPONENT: PERSONNEL SERVICES, BASE POST OFFICE, 40,000 SQ. FT. REHABILITATION; COMPONENT NUMBER AP 2.581] |
|
| [TABLE REGARDING COMPONENT: PERSONNEL SERVICES, BASE POST OFFICE, 75,000 SQ. FT. NC; COMPONENT NUMBER AP 3.521] |
|
| [TABLE REGARDING COMPONENT: RECREATION CENTER, 5,000 MAN, NC, STD FRAME; COMPONENT NUMBER AR 1.521] |
|
| [TABLE REGARDING COMPONENT: RECREATION CENTER, 10,000 MAN, STD. 5 TEMP., STD. FRAME; COMPONENT NUMBER AR 2.521] |
|
| [COVER SHEET REGARDING UNDER DEVELOPMENT] |
|