Files around 20182370PHBT950587901F0000000369905I005.pdf

(View all drawers)
Title Documents
[PHOTOGRAPH OF AN AERIAL VIEW OF A MILITARY CONVOY TRAVELLING ALONG THE LEDO ROAD ON A SECTION THAT WINDS THROUGH THE FOREST]
[PHOTOGRAPH OF AN AERIAL VIEW OF THE LEDO ROAD RUNNING ALONG A RIVER AT THE BASE OF A MOUNTAIN RANGE]
[PHOTOGRAPH OF A TRUCK PULLING AN AMERICAN HOWITZER PAST THE SIGNPOST FOR THE JUNCTION OF THE LEDO AND BURMA ROADS]
[PHOTOGRAPH OF A MILITARY CONVOY OF TRUCKS USING THE BURMA ROAD TO TRAVEL INTO CHINA]
[PHOTOGRAPH OF AN OVERHEAD SHOT OF AN AMERICAN MILITARY CONVOY CROSSING A SUSPENSION BRIDGE OVER THE SALWEEN RIVER IN CHINA]
[PHOTOGRAPH OF A MILITARY CONVOY AS SEEN FROM THE AIR WHILE ASCENDING A MOUNTAIN RANGE ON A SECTION OF THE BURMA ROAD THAT ZIG-ZAGS BACK AND FORTH]
[PHOTOGRAPH OF ENGINEERS UNLOADING LONG SECTIONS OF PIPE FROM A CARGO PLANE TO USE IN CONSTRUCTING THE INDIA-BURMA-CHINA PIPELINE][WITH ATTACHMENT]
[PHOTOGRAPH OF ENGINEERS WORKING TO LOAD TRUCKS WITH 20FT. SECTIONS OF PIPE STACKED IN ORGANIZED PILES]
[PHOTOGRAPH OF CHINESE CIVILIAN LABORERS CARRYING LENGTHS OF PIPE DOWN THE ROAD FOR CONSTRUCTION OF THE MILITARY PIPELINE]
[PHOTOGRAPH OF ENGINEERS AND NATIVE LABORERS WORKING TOGETHER TO JOIN SECTIONS OF PIPE IN CONSTRUCTION OF THE MILITARY PIPELINE]
[PHOTOGRAPH OF AN ENGINEER WORKING ON ONE SIDE OF A SUSPENDED PIPELINE GOING ACROSS A WIDE RIVER]
[PHOTOGRAPH OF AMERICAN ENGINEERS AND CIVILIAN CHINESE LABORERS CONSTRUCTING A MASSIVE BARREL TANK WITH INDIVIDUAL PLATES BEING SET INTO PLACE]
[PHOTOGRAPH OF MULTIPLE PIPELINES CROSSING A SMALL RAVINE TO HEAD INTO A PUMPING STATION SET UP IN BURMA]
[PHOTOGRAPH OF A MILITARY CONVOY PARKED BESIDE A SECTION OF THE PIPELINE TO GAS UP THEIR VEHICLES FROM THE ATTACHED PUMP HOSES]
[PHOTOGRAPH OF TWO ENGINEER TROOPS LOOKING OVER A DAMAGED SECTION OF RAILWAY TO BEGIN PLANNING OUT REPAIRS][WITH ATTACHMENT]
[PHOTOGRAPH OF A GROUP OF ARMY ENGINEERS USING SURVEY EQUIPMENT TO PLAN OUT REPAIRS OF THE RAILWAY FACILITY ALONG CHERBOURG HARBOR]
[PHOTOGRAPH OF ENGINEERS WORKING TO REPAIR ONE LINE OF RAILROAD TRACK USING PARTS SCAVENGED FROM ANOTHER TRACK RUNNING BESIDE IT]
[PHOTOGRAPH OF TWO ARMY ENGINEERS WORKING ON REPAIRING A SECTION OF RAILWAY TRACK CLOSE TO THE FRONT LINES IN GERMANY]
[PHOTOGRAPH OF ENGINEERS WORKING IN A RAILWAY YARD IN FRANCE AND USING RAIL TONGS TO MOVE A SECTION OF TRACK]
[PHOTOGRAPH OF TWO ENGINEERS ON TOP OF A SECTION OF RAILWAY BRIDGE USING A TORCH TO CONNECT THE BEAMS WITH A SALVAGED PLATE]
[PHOTOGRAPH OF SOLDIERS STANDING AROUND A TRAIN ENGINE CHANGING POSITION ON A NEWLY REPAIRED TURNTABLE IN NAPLES]
[PHOTOGRAPH OF A GROUP OF ENGINEERS INSTALLING A TURNOUT ON A SECTION OF RAILWAY BY THE FRENCH PORT OF CHERBOURG]
[PHOTOGRAPH OF THREE ENGINEERS FROM THE TOPOGRAPHIC BATTALION USING SURVEY EQUIPMENT FOR THE FIRST STEP OF MAP PRODUCTION]
[PHOTOGRAPH OF FOUR ENGINEERS FROM A SURVEY PARTY ESTABLISHING A BASE LINE WHILE TWO CHILDREN WATCH THEM WORK]
[PHOTOGRAPH OF TWO ENGINEERS WORKING WITH A MAP SPREAD OUT OVER A TABLE TO SECTION OF GRIDS OF THE MILITARY MAP]
[PHOTOGRAPH OF AN ENGINEER FROM THE TOPOGRAPHIC BATTALION WORKING WITH PHOTOMAPPING EQUIPMENT SPREAD OVER A TABLE]
[PHOTOGRAPH OF THREE ENGINEERS WORKING OVER A TABLE TO ASSEMBLE THE MOSAIC TILES OF A PHOTOMAP TOGETHER INTO ONE COMPLETE PICTURE]
[PHOTOGRAPH OF TWO ENGINEERS WORKING BACK-TO-BACK WITH LITHOGRAPHIC PLATES USED IN MAP REPRODUCTION]
[PHOTOGRAPH OF TWO ENGINEERS WORKING ON PRINTING OUT A MAP FROM A WEBENDORFER LITHOGRAPHIC OFFSET PRESS]
[PHOTOGRAPH OF FOUR SOLDIERS LOADING PACKAGES OF ROLLED UP MAPS INTO THE BACK OF A TRUCK FOR TRANSPORT TO THE FRONT]
[PHOTOGRAPH OF THE FRONT OF THE ENGINEER SCHOOL AT FORT BELVOIR IN VIRGINIA][WITH ATTACHMENT]
[PHOTOGRAPH OF A CLASSROOM FULL OF ENGINEERING OFFICERS LEARNING ABOUT AIRFIELD DRAINAGE FROM THE INSTRUCTOR SPEAKING AT THE FRONT OF THE ROOM]
[PHOTOGRAPH OF STUDENTS AT THE ENGINEER SCHOOL WORKING OUTSIDE WITH WATER PURIFICATION EQUIPMENT DURING THE WATER SUPPLY TECHNICIANS COURSE]
[PHOTOGRAPH OF STUDENTS AT THE ENGINEER SCHOOL LEARNING TO MAKE ADJUSTMENTS ON GAS BURNING REFRIGERATORS WITH EQUIPMENT SET UP IN A LAB]
[PHOTOGRAPH OF ENGINEERING STUDENTS TAKING A CLASS OUTSIDE AS THEIR INSTRUCTOR EXPLAINS THE CONSTRUCTION OF A MILITARY ROAD]
[PHOTOGRAPH OF STUDENTS AT THE ENGINEER SCHOOL WORKING OVER MAPS IN THE DEPARTMENT OF TOPOGRAPHY AS THEIR INSTRUCTOR WATCHES OVER THEM]
[PHOTOGRAPH OF STUDENTS WORKING OUTSIDE AT THE ENGINEER SCHOOL TO TRAIN WITH TWO CRAWLER-MOUNTED POWER SHOVELS]
[PHOTOGRAPH OF A SHOT OF AN ADMINISTRATOR WORKING AT A DESK IN THE ENGINEER SCHOOL BESIDE A SHOT OF A MAILMAN DELIVERY EXTENSION COURSES TO A MAN AT HIS HOME]
[PHOTOGRAPH OF THE ABBOT HALL BUILDING AT THE ENGINEER SCHOOL WHICH HOUSES THE OFFICE OF THE ASSISTANT COMMANDANT][WITH ATTACHMENT]
[PHOTOGRAPH OF TWO SHOTS SHOWING THE ARTISTS AND THE MEN WORKING THE PRINTING PRESS IN THE DEVELOPMENT OF TRAINING PUBLICATIONS]
[PHOTOGRAPH OF OFFICERS SITTING IN CLASS AND WORKING WITH MAPS TO SOLVE TACTICS PROBLEMS IN THE ADVANCED OFFICERS' COURSE]
[PHOTOGRAPH OF A STUDENT PRACTICING TEACHING AT THE FRONT OF A CLASS LEARNING INSTRUCTIONAL METHODS]
[PHOTOGRAPH OF AN INSTRUCTOR POINTING OUT AN AREA ON A SECTIONAL TERRAIN MODEL OF FORT BELVOIR WHICH IS SET UP OVER MULTIPLE TABLES IN THE CENTER OF THE CLASSROOM]
[PHOTOGRAPH OF STUDENTS WORKING OUTSIDE ON OVERHEAD TRANSMISSION LINES DURING AN ELECTRICIAN'S COURSE AT THE SCHOOL]
[PHOTOGRAPH OF ENGINEERING STUDENTS SITTING AT LARGE TABLES COVERED IN MAPS IN A CLASSROOM SPECIALIZING IN TOPOGRAPHIC DRAFTING]
[PHOTOGRAPH OF TWO SHOTS OF STUDENTS LEARNING TO WORK WITH HEAVY EQUIPMENT IN THE CLASSROOM AND THE FIELD]
[PHOTOGRAPH OF A GROUP OF BUILDINGS AND VEHICLES THAT MAKE UP A SAW MILL IN THE PHILIPPINES OPERATED BY AN ENGINEER FORESTRY COMPANY]
[PHOTOGRAPH OF A GROUP OF ENGINEERS USING A GASOLINE-DRIVEN CHAIN SAW TO CUT A LOG INTO A MORE MANAGEABLE SIZE FOR TRANSPORTATION]
[PHOTOGRAPH OF ENGINEERS USING A TRACTOR-DOZER IN A JUNGLE LOGGING OPERATION BESIDE ROWS OF CUT LOGS AND PARKED JEEPS]
[PHOTOGRAPH OF ENGINEERS USING HOOKS TO UNLOAD A MASSIVE LOG FROM THE BACK OF A TRUCK PILED WITH LUMBER]
[PHOTOGRAPH OF ENGINEERS WORKING ON A SAW LINE TO BREAK DOWN LOGS AT THE MILL]
[PHOTOGRAPH OF ENGINEERS WORKING AT A SAW MILL ON MOROTAI ISLAND AND CUTTING BOARDS OUT OF A LONG PIECE OF LUMBER]
[PHOTOGRAPH OF ENGINEERS MOVING NEWLY CUT BOARDS OFF OF A LINE OF ROLLERS CONNECTED TO THE MILL]
[PHOTOGRAPH OF ENGINEERS AND NATIVE WORKERS FROM NEW GUINEA LAYING OUT BOARDS ACROSS A BRIDGE BEING CONSTRUCTED]
[PHOTOGRAPH OF ENGINEERS WORKING WITH A LARGE SECTION OF SQUARE MESH ON A BEACH TO BEGIN FORMING A MAKE-SHIFT ROAD][WITH ATTACHMENT]
[PHOTOGRAPH OF ENGINEERS BUILDING A PORTABLE AIRFIELD NEAR A BEACH IN ITALY USING SOMMERFELD TRACK]
[PHOTOGRAPH OF ENGINEERS FROM THE NINTH ARMY BUILDING A ROAD ALONG THE SHORE USING WIRE-MESH]
[PHOTOGRAPH OF A GROUP OF ENGINEERS ROLLING OUT LENGTHS OF SPLIT BAMBOO CONNECTED TOGETHER TO FORM THE SURFACE OF A NEW ROAD]
[PHOTOGRAPH OF ENGINEERS WORKING TO BUILD A ROAD OUT OF PLANKS WITH A BULLDOZER]
[PHOTOGRAPH OF AN ARMY JEEP DRIVING OVER PLANKS USED TO COVER AND REPAIR A MUDDY ROAD IN FRANCE THAT WAS DAMAGED FROM HEAVY MILITARY TRAFFIC]
[PHOTOGRAPH OF MILITARY VEHICLES DRIVING THROUGH THE BELGIAN COUNTRYSIDE OVER A CORDUROY ROAD BUILT BY THE ENGINEERS]
[PHOTOGRAPH OF ENGINEERS WORKING TOGETHER TO REMOVE RAILROAD TRACK AND TIES SO THAT THE ROAD UNDERNEATH CAN BE USED BY REGULAR VEHICLES]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON FOOTBRIDGE BEING TESTED IN 60 INCHES OF WATER WITH A 3,000 POUND LOAD AT AN ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON FOOTBRIDGE BEING TESTED IN 60 INCHES OF WATER WITH A 3,000 POUND LOAD AT AN ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF THE PONTOON BASES FOR A BRIDGE BEING TESTED AT AN ARMY FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF THE PONTOON BASES FOR A BRIDGE BEING TESTED AT AN ARMY FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF THE PONTOON BASES FOR A BRIDGE BEING TESTED AT AN ARMY FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A SOLDIER STANDING BY THE PONTOON BASES OF A BRIDGE BEING TESTED AT AN ARMY FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A SOLDIER WORKING BY THE PONTOON BASES OF A BRIDGE BEING TESTED AT AN ARMY FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF THE PONTOON BASES FOR A BRIDGE BEING TESTED AT AN ARMY FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A SOLDIER STANDING BY THE PONTOON BASES OF A BRIDGE BEING TESTED AT AN ARMY FACILITY]
[PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED DURING RUNS THREE AND FOUR AT AN ARMY FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON FOOTBRIDGE BEING TESTED IN 60 INCHES OF WATER WITH A 600 POUND LOAD AT AN ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON FOOTBRIDGE BEING TESTED IN 60 INCHES OF WATER WITH A 600 POUND LOAD AT AN ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON FOOTBRIDGE BEING TESTED IN 60 INCHES OF WATER WITH A 600 POUND LOAD AT AN ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON FOOTBRIDGE BEING TESTED IN 30 INCHES OF WATER WITHOUT A LOAD AT AN ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON FOOTBRIDGE BEING TESTED IN 18 INCHES OF WATER WITH A 3,600 POUND LOAD AT AN ARMY TESTING FACILITY]
[PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 18 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 18 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 18 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH A 3,600 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 18 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 18 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 618 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH A 3,600 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 3,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 3,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 3,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 3,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 3,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 3,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 3,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED IN AN ARMY FACILITY BY A SOLDIER SITTING ABOVE IT]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 1,000-1,500 POUND LOAD IN 30-15 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 3,000 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 1,500 POUND LOAD IN 15 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 1,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 1,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 1,500 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]