Files around 20182370PHBT950587904F0000000358720I007.pdf

(View all drawers)
Title Documents
[PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH NO LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 3,600 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 3,000 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 3,000 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 3,000 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 3,600 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF A PONTOON BRIDGE BEING TESTED WITH A 1,800 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 1,800 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 1,800 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 1,800 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 1,800 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 600 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 600 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 600 POUND LOAD IN 60 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED AT AN ARMY FACILITY DURING THE FIRST TEST RUN]
[PHOTOGRAPH OF TWO SHOTS OF A PONTOON BRIDGE BEING TESTED WITH A 2,000 POUND LOAD IN 30 INCHES OF WATER AT THE ARMY TESTING FACILITY]
[PHOTOGRAPH - WIDE SHOT OF THE LANDSCAPE DURING DEMOLITIONS FOR BUILDING A NEW ROAD SHOWING AN EXPLOSION UP ON A HILL OUTSIDE OF CAMP]
[PHOTOGRAPH OF A SIGN POST SET ON A SANDY HILL BEHIND BARBED WIRE FOR CAMP CASTLE AND TASK FORCE 16 IN PUENTE GRANDE, HONDURAS]
[PHOTOGRAPH OF A GROUP OF SOLDIERS WORKING AROUND A QUARRY WITH LARGE PILES OF GRAVEL BEING MOVED BY BELTS ON LARGE MACHINES]
[PHOTOGRAPH - WIDE SHOT OF THE ROADS CUT INTO THE MOUNTAIN SIDE WITH A JEEP AND BULLDOZER TRAVELLING ON DIFFERENT LEVELS]
[PHOTOGRAPH - HALF SHOT OF AN UNIDENTIFIED SOLDIER STANDING OUTSIDE OF A TENT WITH A SIGN FOR THE 416TH ENGINEER COMMAND]
[PHOTOGRAPH - WIDE SHOT OF SOLDIERS WORKING ON A PONTOON BRIDGE BOTH FROM THE SHORE AND ON THE BRIDGE ITSELF]
[PHOTOGRAPH - THREE SHOT OF AN UNIDENTIFIED GENERAL GIVING A CERTIFICATE TO A SOLDIER DURING AN OUTDOOR CEREMONY WHILE ANOTHER UNIDENTIFIED SOLDIER HOLDS A FLAG AT ATTENTION BESIDE THEM]
[PHOTOGRAPH - TWO SHOT OF UNIDENTIFIED OFFICERS STANDING TOGETHER OUTSIDE ON A STAGE WHILE HOLDING FRAMED CERTIFICATES DURING A CEREMONY]
[PHOTOGRAPH - HALF SHOT PORTRAIT OF AN UNIDENTIFIED SOLDIER POSING IN UNIFORM]
[PHOTOGRAPH - WIDE SHOT OF A GROUP PICTURE OF THE 619TH ENGINEERS POSING TOGETHER OUTSIDE WITH THEIR FLAG IN FRONT OF A BUILDING]
[PHOTOGRAPH COLLAGE OF SCENES AND PEOPLE FROM THE ROAD CONSTRUCTION PROJECT IN HONDURAS]
[PHOTOGRAPH - WIDE SHOT OF A GROUP PICTURE OF THE 619TH ENGINEERS POSING TOGETHER OUTSIDE WITH THEIR FLAG IN FRONT OF A BUILDING]
[PHOTO][(FULL SHOT) SOLDIERS STANDING ON SIDE OF HILL LOOKING DOWN AT SERGEANT FIRST CLASS GLEN A. HUNTLEY][WITH ATTACHMENT]
[PHOTO][(WIDE SHOT) SOLDIERS OBSERVING LIEUTENANT EDWARDS J. CORDING POINTING AT A MAP]
[PHOTO][(WIDE SHOT) SOLDIERS INSTALLING PONTOON BRIDGE]
[PHOTO][(WIDE SHOT) SOLDIERS CONSTRUCTING WOODEN BRIDGE OVER SMALL STREAM]
[PHOTO][(MEDIUM SHOT) LIEUTENANT BETLY BRIEFING LIEUTENANT GENERAL DI CASOLA AND PARTY]
[PHOTO][(WIDE SHOT) MAKESHIFT VIETNAMESE VILLAGE AND WOODEN FENCE ENCLOSURE IN MUD FIELD WITH TREES AND SMOKE PLUME IN BACKGROUND][WITH ATTACHMENT]
[PHOTO][(WIDE SHOT) DEMONSTRATION VIETNAMESE VILLAGE WITH STRAW THATCHED ROOF WITH WOODEN FENCE TO THE RIGHT]
[PHOTO][(WIDE SHOT) TWO UNIDENTIFIED SOLDIERS STANDING IN STRAW HUT WITH UNIDENTIFIED MAN KNEELED WITH TWO SOLDIER STANDING TO THE RIGHT WITH MEDIC ASSISTING WOUNDED MAN]
[PHOTO][(FULL SHOT) SERGEANT FIRST CLASS LAMOTHEAND PRIVATE RICHARD FISHER II CHECKING THE S-6 NIKE ELEVATOR CIRCUIT CUTOFF VALVE]
[PHOTO][(FULL SHOT) SPECIALIST FOUR TIBERIUS KRAMER CHECKS PRESSURE ON REFRIGERATOR WHILE SERGEANT FIRST CLASS DUDLEY FOWLER OBSERVES]
[PHOTO][(LONG SHOT) SERGEANT FIRST CLASS ROBERT H. JARRELL POINTING AT COMPONENTS OF DIESEL ENGINE WITH SOLDIER OBSERVING IN FOREGROUND]
[PHOTO][(MEDIUM SHOT) PRIVATE EDWARD M. MAYER CHECKING CIRCUITS ON NIKE ELECTRICAL CONTROL CABINET WHILE STAFF SERGEANT SPRAGUE OBSERVES]
[PHOTO][(MEDIUM SHOT) PRIVATE FIRST CLASS EDWARD T. GROSSHEIM MAKING ADJUSTMENTS TO ELECTRONICAL TEST EQUIPMENT]
[PHOTO][(THREE QUARTER SHOT) PRIVAT CARL F. MILLER MAKING ADJUSTMENT TO THE HIGH PRESSURE AIR COMPRESSOR]
[PHOTO][(WIDE SHOT) UNIDENTIFIED SOLDIERS CONSTRUCTING WOODEN STRUCTURE]
[PHOTO][(FULL SHOT) SOLDIERS CONSTRUCTING WOODEN TRUSTLE BRIDGE]
[PHOTO][(WIDE SHOT) SOLDIERS MARCHING IN FORMATION WHILE SOLDIER HOLDING CLIPBOARD OBSERVES]
[PHOTO][(WIDE SHOT) SOLDIERS CLIMBING MONKEY BARS OVER DEEP DITCH WITH SOLDIERS WAITING IN THE BACKGROUND]
[PHOTO][(MEDIUM SHOT) CANDIDATES ROBERT PIGEON AND GREGORY COMER WORKING ON PROBLEM IN BOOK]
[PHOTO][(MEDIUM SHOT) CANDIDATE ERNEST C. BENTLEY SPEAKING WITH LIEUTENANT ROBERT B. FOSTER]
[PHOTO][(LONG SHOT) GROUPS OF SOLDIERS WITH HELMETS OBSERVE BRIDGE]
[PHOTO][(FULL SHOT) UNIDENTIFIED OFFICER OBSERVING UNIDENTIFIED CANDIDATES WORKING ON RADIO EQUIPMENT]
[PHOTO][(MEDIUM SHOT) STAFF SERGEANT STANLEY TADAKUMA OBSERVING CANDIDATE HANS M. STRONG READING A STEREO MAP]
[PHOTO][(FULL SHOT) OF MOBILE FLOATING ASSAULT BRIDGE RAFT LOADED WITH TANK][WITH ATTACHMENTS]
[PHOTO][(FULL SHOT) SOLDIERS CONSTRUCTING A CLASS 60 RAFT IN UNIDENTIFIED BODY OF WATER][WITH ATTACHMENT]
[PHOTO][(FULL SHOT) LOW ANGLE SHOT OF ENGINEER OFFICERS CROSSING WOODEN PLANKS WHILE OTHER OFFICERS HOLD THE PLANKS DOWN WITH THEIR BODY WEIGHT FROM TWO OPPOSITE PLATFORMS][WITH ATTACHMENT]
[PHOTO][(FULL SHOT) SOLDIER CROSSING SMALL BODY OF WATER WITH THE ASSISTANCE OF A WIRE WHILE GROUP OF SOLDIER PREPARE EQUIPMENT TO CROSS][WITH ATTACHMENT]
[PHOTO][(FULL SHOT) UNIDENTIFIED SOLDIER LOOKING AT TEAM EVALUATION FOR CLOSE COURSE COMBAT WITH SOLDIERS SEATED TO THE LEFT AND OTHER GROUP OF SOLDIERS IN BACKGROUND][WITH ATTACHMENT]
[PHOTO][(FULL SHOT) FIVE SOLDIERS PREPARING TO ENTER GAS ZONE IN UNIFORM AND GAS MASK][WITH ATTACHMENT]
[PHOTO][(FULL SHOT) SOLDIERS CONSTRUCTING TIMBER BRIDGE OVER DITCH WHILE GROUP OF SOLDIERS OBSERVE FROM THE SIDE OF THE ROAD][WITH ATTACHMENT]
[PHOTO][(WIDE SHOT) OFFICER CANDIDATES READING AT TABLES WHILE UNIDENTIFIED FEMALE SERGEANT LOOKS THROUGH BOOKS TO THE RIGHT][WITH ATTACHMENT]
[PHOTO][(WIDE SHOT) SOLDIERS OBSERVING JEEP ON BARREL RAFT IN UNIDENTIFIED BODY OF WATER WITH SOLDIER OBSERVING IN CANOE IN BACKGROUND][WITH ATTACHMENT]
[PHOTO][(FULL SHOT) GEOLOGY MODEL DISPLAY AT THE ENGINEER SCHOOL][WITH ATTACHMENT]
[PHOTO][(WIDE SHOT) FLOATING BRIDGE DISPLAY AT THE ENGINEER SCHOOL WITH SOLDIERS OBSERVING IN THE FOREGROUND AND INSTRUCTOR IN BACKGROUND][WITH ATTACHMENT]
[PHOTO][(FULL SHOT) ENGINEER OFFICERS CONSTRUCTING A T/6 BUILDING][WITH ATTACHMENT]
[PHOTO][(LONG SHOT) SMALL MUSHROOM CLOUD IN FIELD WITH SOLDIERS OBSERVING FROM GRAND STAND IN FOREGROUND][WITH ATTACHMENT]
[PHOTO][(WIDE SHOT) TANK FIRING AT TARGET IN FIELD FROM THICK BRUSH]
[PHOTO][(WIDE SHOT) HELICOPTER LANDING IN FIELD WITH SOLDIERS DISEMBARKING]
[PHOTO][(FULL SHOT) DISPLAY REGARDING CAREER PROGRAMS IN THE ENGINEER SCHOOL][WITH ATTACHMENT]
[PHOTO][(FULL SHOT) CLOSE UP OF UNIDENTIFIED ELECTRICAL EQUIPMENT ON TRIPOD][WITH ATTACHMENT]
[PHOTO][(FULL SHOT) THIRTY INCH SEARCH LIGHT ON WHEELED TRAILER]
[PHOTO][(FULL SHOT) CLOSE UP OF XENON LIGHT]
[PHOTO][(FULL SHOT) TWO UNIDENTIFIED SOLDIERS TESTING SOIL][WITH ATTACHMENT]
[PHOTO][(FULL SHOT) SOLDIERS CONSTRUCTING FRAME OF T/O BUILDING]
[PHOTO][(WIDE SHOT) CLASSROOM OF SOLDIERS DISASSEMBLING AND ASSEMBLING M-14 RIFLE]
[PHOTO][(WIDE SHOT) SOLDIERS OBSERVING CAPTAIN PACE INSTRUCTING THEM ON THE ATTACK OF MULLIGAN HILL]
[PHOTO][(WIDE SHOT) STUDENTS SEATED TO THE RIGHT OF LARGE DISPLAY OF MAP WITH INSTRUCTOR AT FRONT OF ROOM]
[PHOTO][(THREE QUARTER SHOT) OFFICER JACKMAN POINTING AT LARGE MAP WITH STUDENT OBSERVING]
[PHOTO][(WIDE SHOT) STUDENTS SEATED IN CLASS ROOM OBSERVING UNIDENTIFIED INSTRUCTOR][WITH ATTACHMENT]
[PHOTO][(FULL SHOT) SOLDIERS LOADING UNIDENTIFIED CONTAINER ON BED OF TRUCK WITH ASSISTANCE OF CRANE]
[PHOTO][CLOSE UP OF 150 KILOWATT GENERATOR][WITH ATTACHMENTS]
[PHOTO][(FULL SHOT) CONTROL PANELS OF 150 KILOWATT GENERATOR][WITH ATTACHMENT]
[PHOTO][(FULL SHOT) UNIDENTIFIED ELECTRICAL EQUIPMENT][WITH ATTACHMENT]
[PHOTO][(WIDE SHOT) SOLDIERS FINISHING CONSTRUCTION ON WOODEN BRIDGE ACROSS STREAM]
[PHOTO][(WIDE SHOT) SOLDIERS CONSTRUCTING WOODEN BRIDGE ON SIDE OF STREAM]
[PHOTO][(WIDE SHOT) SOLDIERS CONSTRUCTING FRAME OF WOODEN BRIDGE IN STREAM AT NIGHT]
[PHOTO][(FULL SHOT) REAR VIEW OF MINE HOLE PUNCHER, COOKIE CUTTER JUNIOR, ATTACHED TO JEEP]
[PHOTO][(FULL SHOT) SOLDIER ASSISTING ROUND PIECE OF SOD BACK TO THE GROUND TO COVER MINE HOLE]
[PHOTO][(FULL SHOT) RAMP FOR THE BAILEY BRIDGE]
[PHOTO][(FULL SHOT) TANK CROSSING BAILEY BRIDGE]
[PHOTO][(FULL SHOT) TANK ON EDGE OF BAILEY BRIDGE WITH TWO SOLDIERS IN BACKGROUND]
[PHOTOGRAPHIC COPY][SCHEDULE REGARDING EOBC TRAINING AT CAMP A.P. HILL]
[PHOTO][(FULL SHOT) SOLDIERS LIFTING CART LOADED WITH FIFTY-FIVE GALLON BARREL USING BASIC PULLEY SYSTEM]
[PHOTO][(FULL SHOT) SOLDIER STRADLING WOODEN LOG WITH OTHER SOLDIERS IN TRENCH BELOW]
[PHOTO][(MEDIUM SHOT) REAR VIEW OF SOLDIER WITH HANDS LOCKED BEHIND HEAD AS ANOTHER SOLDIER USES DESK TO WRITE DOWN SOMETHING ON PAPER]
[PHOTO][(FULL SHOT) HIGH ANGLE OF UNIDENTIFIED SOLDIER SPEAKING TO ANOTHER UNIDENTIFIED SOLDIER THROUGH DOOR INTO TRENCH]
[PHOTO][(FULL SHOT) SOLDIER RUNNING TOWARDS HELICOPTER]
[PHOTO][(LONG SHOT) TWO ENDS OF PONTOON BRIDGES BEING LINED UP IN RIVER]
[PHOTO][(FULL SHOT) SERGEANT FIRST CLASS THOMAS NOLTA INSTRUCTING SERGEANT FIRST CLASS CARMEN DE GEUS IN THE USE OF THE WORDEN MASTER GRAVITY METER][WITH ATTACHMENT]
[PHOTO][(MEDIUM SHOT) STAFF SERGEANT LARRY A. MUMFORD INSTRUCTING PRIVATE PAUL L. PICKETT ON THE MULTIPLEX][WITH ATTACHMENT]
[PHOTO][(THREE QUARTER SHOT) STAFF SERGEANT MICHAEL SINTON POINTING AT BOARD REGARDING VERTICAL CURVE COMPUTATIONS WHILE LOOKING AT STUDENTS][WITH ATTACHMENT]
[PHOTO][(FULL SHOT) SPECIALIST FIVE RICHARD MILLOY ASSISTING PRIVATE JOSEPH SCHWAN ON THE USE OF THE PLANE TABLE FOR A MAP PROBLEM][WITH ATTACHMENTS]
[PHOTO][(FULL SHOT) ROBERT JONES KNEELED NEXT TO STUDENT LOOKING AT MAP WHILE TWO OTHER SOLDIERS OBSERVE]